• Ensure suitably qualified person tests the system (including pipework) for leaks before and after burial in accordance with AS4897-2008 and UPSS Regulation. • Check requirements to install Vapour recovery at service stations section of the EPA website. if you need to know more about AS4897-2008 standard please click here.
• Service leak detection equipment. • Service cathodic protection systems.
Service station operator should check fill point spill containment area for product/water. Remove liquid prior to delivery and store for appropriate waste disposal.
• Check SIRA report and immediately investigate all discrepancies including fail and inconclusive results.
• Check dip stick for wear. • Dip tanks for water and remove water if present (non E10 and bio-blends). • Check vent points and remove blockages. • Check tank pit observation wells and immediately investigate leaks. • Check under sump pumps.